Abstract

The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipeline on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and night of-way (ROW) management practices. This report presents the results of a survey conducted over the period of August 12-13, 1991, at the Bayou Grand Cane crossing in De Soto Parish, Louisiana, where a pipeline constructed three years prior to the survey crosses the bayou through mature bottomland hardwoods. The sit was not seeded or fertilized after construction activities. At the time of sampling, a dense herb stratum (composed of mostly native species) covered the 20-m-wide ROW, except within drainage channels. As a result of the creation of the ROW, new habitat was created, plant diversity increased, and forest habitat became fragmented. The ROW must be maintained at an early stage of succession to allow access to the pipeline however, impacts to the wetland were minimized by decreasing the width of the ROW to 20 m and recreating the drainage channels across the ROW. The canopy trees on the ROW`s edge shaded partmore » of the ROW, which helped to minimize the effects of the ROW.« le


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/1525306807
Back to Top

Document information

Published on 01/01/1994

Volume 1994, 1994
DOI: 10.2172/10106577
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?