Abstract

This papers analyses the choice, combination and optimization of maintenance measures in the maintenance of oil and gas pipelines, initially proposes 4 factors system that influence effect of maintenance on pipelines, which includes person factor, fieldwork difficult degree, fieldwork management and environment condition, establishes hierarchy model of maintenance measures, introduces fuzzy analytical hierarchy process based on triangular fuzzy number, and compares the effects of different maintenance measures in order to determine the weight under single factor condition and composite matter-element of maintenance measures. On the basis of the above analysis, the paper proposes 4 methods of maintenance projects fund distribution based on different weight of efficiency factor of maintenance measures under the condition of limited charge. Using the fuzzy-gray-element theory combining fuzzy mathematics, gray theory and matter-element analysis, the paper analyses maintenance measure fund distribution based on different weight of efficiency factor of maintenance measures with fuzzy-gray-element correlation decision-making analysis, and conclusively determines optimization of maintenance project according to criteria of maximized correlative degree.


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1007/978-3-540-71441-5_50
https://dblp.uni-trier.de/db/conf/icfie/icfie2007.html#ZhangPL07,
https://academic.microsoft.com/#/detail/1503037788
Back to Top

Document information

Published on 01/01/2007

Volume 2007, 2007
DOI: 10.1007/978-3-540-71441-5_50
Licence: Other

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?