This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.
The different versions of the original document can be found in:
Published on 01/01/2000
Volume 2000, 2000
DOI: 10.2172/803652
Licence: CC BY-NC-SA license
Are you one of the authors of this document?