(Created page with " == Abstract == In a contract for work, the proprietor provides the raw materials to be processed to the contractor, with the ownership of the raw materials being owned by th...") |
m (Scipediacontent moved page Draft Content 825282638 to Wu Ma 2019a) |
(No difference)
|
In a contract for work, the proprietor provides the raw materials to be processed to the contractor, with the ownership of the raw materials being owned by the proprietor. After the performance of the contract, the proprietorâs request for the contractor to return the remaining raw materials is the claim in real right of raw materials. When the raw materials cannot be returned due to loss, in order to fully protect the interests of the real right holder, the protection method for creditorâs rights can be adopted by changing the proprietorâs claim in real right to claim for real right damages. Then by the proprietor should claim for damages against the contractor within 2 years after the proprietor knew or should have known the loss of the raw materials.
The different versions of the original document can be found in:
Published on 01/01/2019
Volume 2019, 2019
DOI: 10.1007/978-981-15-0342-9_15
Licence: Other
Are you one of the authors of this document?