Abstract

In a contract for work, the proprietor provides the raw materials to be processed to the contractor, with the ownership of the raw materials being owned by the proprietor. After the performance of the contract, the proprietor’s request for the contractor to return the remaining raw materials is the claim in real right of raw materials. When the raw materials cannot be returned due to loss, in order to fully protect the interests of the real right holder, the protection method for creditor’s rights can be adopted by changing the proprietor’s claim in real right to claim for real right damages. Then by the proprietor should claim for damages against the contractor within 2 years after the proprietor knew or should have known the loss of the raw materials.


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1007/978-981-15-0342-9_15 under the license http://www.springer.com/tdm
https://academic.microsoft.com/#/detail/2983694573
Back to Top

Document information

Published on 01/01/2019

Volume 2019, 2019
DOI: 10.1007/978-981-15-0342-9_15
Licence: Other

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?