You do not have permission to edit this page, for the following reason:

You are not allowed to execute the action you have requested.


You can view and copy the source of this page.

x
 
1
2
== Abstract ==
3
4
This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.
5
6
7
== Original document ==
8
9
The different versions of the original document can be found in:
10
11
* [http://dx.doi.org/10.2172/803652 http://dx.doi.org/10.2172/803652]
12
13
* [https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf]
14
15
* [https://core.ac.uk/display/71219162 https://core.ac.uk/display/71219162],
16
: [https://digital.library.unt.edu/ark:/67531/metadc735080 https://digital.library.unt.edu/ark:/67531/metadc735080],
17
: [https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf],
18
: [http://www.osti.gov/scitech/biblio/803652 http://www.osti.gov/scitech/biblio/803652],
19
: [https://academic.microsoft.com/#/detail/2271366538 https://academic.microsoft.com/#/detail/2271366538]
20

Return to JULYK 2000a.

Back to Top

Document information

Published on 01/01/2000

Volume 2000, 2000
DOI: 10.2172/803652
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?