Abstract

The purpose of this technical evaluation is to determine whether the secondary hoses are to be categorized as Commercial Grade Items (CGI) or Engineered Equipment. This determination will identify whether or not use of the CGI Dedication process is appropriate. Document type: Rep[...]

Abstract

Two geophysical surveys were conducted over a vitrified clay pipeline (VCP) that was used to transfer liquid radioactive waste from the 224-U Building to the 216-U-8 and 216-U-12 cribs. The objectives of the surveys were to locate the VCP in the northern site, locate the bends in [...]

Abstract

An Acceptance Test Report for the testing of Pumps, Leak Dectors, and Controls of an underground transfer line. Document type: Report

Abstract

This document is a Engineering/Tools Evaluates for tools used to fill the Cross-Site transfer line encasements with nitrogen. Document type: Report

Abstract

Tank 241-SY-101 waste level growth is an emergent, high priority issue. The purpose of this document is to record the hazards evaluation process and document potential hazardous conditions that could lead to the release of radiological and toxicological material from the proposed [...]

Abstract

This analysis evaluates the mitigated consequences of a potential waste transfer spill from an underground pipeline. The spill forms a surface pool. One waste composite, a 67% liquid, 33% solid, from a single shell tank is evaluated. Even drain back from a very long pipeline (50,000 [...]

Abstract

The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. [...]

Abstract

This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the [...]

Abstract

Evaluation of direct buried piping currently in use or designated for future Saltwell pumping in S and SX Farms. Documented evaluation of failed S-103 saltwell pumping transfer line 3 inch SN-219. This evaluation is intended to reflect current status of Saltwell piping, when taken [...]

Abstract

RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim [...]