Abstract

The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel.


Original document

The different versions of the original document can be found in:

https://digital.library.unt.edu/ark:/67531/metadc619141/m2/1/high_res_d/16874.pdf,
https://digital.library.unt.edu/ark:/67531/metadc619141,
https://academic.microsoft.com/#/detail/2011914411


DOIS: 10.2172/16874 10.2172/10148004

Back to Top

Document information

Published on 01/01/1997

Volume 1997, 1997
DOI: 10.2172/16874
Licence: CC BY-NC-SA license

Document Score

0

Views 2
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?