Abstract
Measurements of pressure and flow in a number of pumped plastic sewer mains have been carried out in order to compare the actual observed transients with computations. Primarily the situation following pump run-down has been studied. The investigation covered pipelines with steadily [...]Abstract
In the present paper a method of analytical determination of reactions and angles of pressure is considered with the four-bar linkage as an example. The determined sequence for the expression of acceleration of the points and angle acceleration of the links is presented. Further the [...]Abstract
Workability of concrete varies during pumping. Even though concrete satisfies the required workability before pumping, it often does not satisfy the required standard after pumping. Moreover, serious problem could happen such as segregation and blockage. In this study, the rheological [...]