Abstract

Sewer construction in urban areas often has significant impacts on work zone traffic control, traffic flow, and safety. Contractors typically introduce night shifts to meet contract schedule and to reduce traffic congestion. However, there is a lack of understanding of how shift work is associated with labor productivity in sewer construction. This research investigated labor productivity of ten major activities in sewer and drainage construction in Ho Chi Minh City, Vietnam when these activities were performed in both day and night shifts. Levene’s tests and t-tests were employed to analyze the data and investigate the research hypothesis. Results revealed that four activities were significantly sensitive to shift work and the other six activities were not. Pavement cutting and timber piling activities had higher productivity in day shifts. In contrast, steel sheet piling and manhole concreting were more productive in night shifts. Labor productivity of excavation, formwork installation, rebar fabrication/installation, pipe installation, sand filling, and asphalt pavement was not significantly different between the two shifts. The results were verified by the experienced site managers/engineers through structured interviews. The findings form this paper help contractors effectively manage their sewer projects by allocating resources appropriately to construction activities between the day and night shifts.


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1061/9780784413517.090
http://sipb.sggw.pl/CRC2014/data/papers/9780784413517.090.pdf,
https://academic.microsoft.com/#/detail/2127197939
Back to Top

Document information

Published on 01/01/2014

Volume 2014, 2014
DOI: 10.1061/9780784413517.090
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?