Abstract

With the rising of railway traffic flow, railway system suffers problems like voltage drop, unbalance, etc. One
promising solution, studied in this paper, is the hybridization of railway power substation. The design of this
hybrid architecture is complex and depends on a lot of techno-economic parameters. This paper develops technoeconomic
models used for optimization that takes into account all Life Cycle Cost. An example of AC power
substation is studied and results reveal that the return of investment (ROI) period is around 4 years with the
integration of energy storage system and wind power system.


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.5281/zenodo.1441143 under the license http://creativecommons.org/licenses/by-nc-nd/4.0/legalcode
http://dx.doi.org/10.5281/zenodo.1441144 under the license http://creativecommons.org/licenses/by-nc-nd/4.0/legalcode


DOIS: 10.5281/zenodo.1441144 10.5281/zenodo.1441143

Back to Top

Document information

Published on 01/01/2018

Volume 2018, 2018
DOI: 10.5281/zenodo.1441144
Licence: Other

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?