Abstract

This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the immobilization plant for processing. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for all Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and AZ Tank Farms.