Abstract

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards.


Original document

The different versions of the original document can be found in:

https://core.ac.uk/display/71305400,
https://digital.library.unt.edu/ark:/67531/metadc888281,
http://www.osti.gov/scitech/biblio/915089-hwma-rcra-closure-plan-fluorinel-dissolution-process-makeup-cooling-heating-systems-voluntary-consent-order-site-tank-action-plan-tank-systems-intec-intec-intec-intec,
https://academic.microsoft.com/#/detail/1543646522
Back to Top

Document information

Published on 01/01/2007

Volume 2007, 2007
DOI: 10.2172/915089
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?