Abstract

feasibility study for the installation of Wave Energy Converters (WEC) in a Spanish Mediterranean port is evaluated in this paper. The final aim is to evaluate the possibility of building a new infrastructure which combines a breakwater and a WEC able to provide energy to the commercial port of Valencia. An estimation of the wave power potential is made according to existing databases from different sources. A review of the existing WEC types is carried out in order to choose the most suitable technology for its installation in a port environment. The authors discuss the main advantages and issues of the integration of WEC in port breakwaters. A prospective study for the Port of Valencia is made, considering the port energy demand evolution, historical data on wave energy potential and the port expansion plans. We conclude that Overtopping Devices (OTDs) are the most suitable ones to allow the good integration with the new breakwater needed for the expansion of the Port of Valencia and we give an estimation on the power available from the resource in our case study.

Full document

The PDF file did not load properly or your web browser does not support viewing PDF files. Download directly to your device: Download PDF document
Back to Top
GET PDF

Document information

Published on 01/01/2019

Licence: CC BY-NC-SA license

Document Score

0

Views 4
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?