This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe support to the Civil Engineering group.
The different versions of the original document can be found in:
Published on 01/01/1998
Volume 1998, 1998
DOI: 10.2172/345002
Licence: CC BY-NC-SA license
Are you one of the authors of this document?