The first buried asbestos-cement (Transite) pipeline used in high temperature (approximately 300/sup 0/F) service for transport of geothermal fluids was installed in the fall of 1975, and has seen 1/sup 1///sub 2/ years of service. The line is 4000 ft long, between the deep geothermal wells No. 1 and No. 2, in the Raft River Valley of Idaho. The experience in using this pipeline has been satisfactory, and methods have been developed for minimizing the thermal expansion/thermal shock breakage problems. Recommendations on improved design and construction practices for future pipelines are given. The substantially reduced cost (factor of 2) of an asbestos-cement pipeline compared to the conventional steel pipeline, plus the esthetically desirable effect of a buried pipeline dictate adoption of this type as standard practice for moderate temperature geothermal developments. The Raft River Geothermal Project intends to connect all future wells with pipelines of asbestos-cement, insulated with 1 to 2-inches of urethane, and buried between 2 and 3 ft. Total cost will be approximately $110,000/mile for 10-inch diameter pipe, $125,000/mile for 12-inch diameter.
 
The first buried asbestos-cement (Transite) pipeline used in high temperature (approximately 300/sup 0/F) service for transport of geothermal fluids was installed in the fall of 1975, and has seen 1/sup 1///sub 2/ years of service. The line is 4000 ft long, between the deep geothermal wells No. 1 and No. 2, in the Raft River Valley of Idaho. The experience in using this pipeline has been satisfactory, and methods have been developed for minimizing the thermal expansion/thermal shock breakage problems. Recommendations on improved design and construction practices for future pipelines are given. The substantially reduced cost (factor of 2) of an asbestos-cement pipeline compared to the conventional steel pipeline, plus the esthetically desirable effect of a buried pipeline dictate adoption of this type as standard practice for moderate temperature geothermal developments. The Raft River Geothermal Project intends to connect all future wells with pipelines of asbestos-cement, insulated with 1 to 2-inches of urethane, and buried between 2 and 3 ft. Total cost will be approximately $110,000/mile for 10-inch diameter pipe, $125,000/mile for 12-inch diameter.
 
Document type: Report
 
 
== Full document ==
 
<pdf>Media:Draft_Content_683947787-beopen15-4902-document.pdf</pdf>
 
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc1404780/m2/1/high_res_d/7108674.pdf https://digital.library.unt.edu/ark:/67531/metadc1404780/m2/1/high_res_d/7108674.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc1404780/m2/1/high_res_d/7108674.pdf https://digital.library.unt.edu/ark:/67531/metadc1404780/m2/1/high_res_d/7108674.pdf]
  
* [http://www.osti.gov/geothermal/biblio/7108674-asbestos-cement-pipeline-experience-raft-river-geothermal-project http://www.osti.gov/geothermal/biblio/7108674-asbestos-cement-pipeline-experience-raft-river-geothermal-project],[https://academic.microsoft.com/#/detail/1544618037 https://academic.microsoft.com/#/detail/1544618037]
+
* [https://www.osti.gov/servlets/purl/7108674 https://www.osti.gov/servlets/purl/7108674],
 +
: [https://academic.microsoft.com/#/detail/1544618037 https://academic.microsoft.com/#/detail/1544618037]

Latest revision as of 12:35, 22 January 2021

Abstract

The first buried asbestos-cement (Transite) pipeline used in high temperature (approximately 300/sup 0/F) service for transport of geothermal fluids was installed in the fall of 1975, and has seen 1/sup 1///sub 2/ years of service. The line is 4000 ft long, between the deep geothermal wells No. 1 and No. 2, in the Raft River Valley of Idaho. The experience in using this pipeline has been satisfactory, and methods have been developed for minimizing the thermal expansion/thermal shock breakage problems. Recommendations on improved design and construction practices for future pipelines are given. The substantially reduced cost (factor of 2) of an asbestos-cement pipeline compared to the conventional steel pipeline, plus the esthetically desirable effect of a buried pipeline dictate adoption of this type as standard practice for moderate temperature geothermal developments. The Raft River Geothermal Project intends to connect all future wells with pipelines of asbestos-cement, insulated with 1 to 2-inches of urethane, and buried between 2 and 3 ft. Total cost will be approximately $110,000/mile for 10-inch diameter pipe, $125,000/mile for 12-inch diameter.


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/1544618037
Back to Top

Document information

Published on 01/01/1977

Volume 1977, 1977
DOI: 10.2172/7108674
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?