Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium Extraction (PUREX) Plant are no longer required. This document identified unneeded process pit jumper connections, describes former designated routing, denotes current status (i.e., open or blanked), and recommends appropriate disposition for all. Blanking of identified nozzles should be accomplished by Project W-314 upon installation of jumpers and acceptance by Tank Waste Remediation System (TWRS) Tank Farm Operations.
 
Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium Extraction (PUREX) Plant are no longer required. This document identified unneeded process pit jumper connections, describes former designated routing, denotes current status (i.e., open or blanked), and recommends appropriate disposition for all. Blanking of identified nozzles should be accomplished by Project W-314 upon installation of jumpers and acceptance by Tank Waste Remediation System (TWRS) Tank Farm Operations.
 
Document type: Report
 
 
== Full document ==
 
<pdf>Media:Draft_Content_772162915-beopen261-3552-document.pdf</pdf>
 
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc1319606/m2/1/high_res_d/10148339.pdf https://digital.library.unt.edu/ark:/67531/metadc1319606/m2/1/high_res_d/10148339.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc1319606/m2/1/high_res_d/10148339.pdf https://digital.library.unt.edu/ark:/67531/metadc1319606/m2/1/high_res_d/10148339.pdf]
  
* [https://www.osti.gov/scitech/servlets/purl/10148339 https://www.osti.gov/scitech/servlets/purl/10148339],[https://academic.microsoft.com/#/detail/2261109641 https://academic.microsoft.com/#/detail/2261109641]
+
* [https://www.osti.gov/scitech/servlets/purl/10148339 https://www.osti.gov/scitech/servlets/purl/10148339],
 +
: [https://academic.microsoft.com/#/detail/2261109641 https://academic.microsoft.com/#/detail/2261109641]

Revision as of 12:59, 22 January 2021

Abstract

Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium Extraction (PUREX) Plant are no longer required. This document identified unneeded process pit jumper connections, describes former designated routing, denotes current status (i.e., open or blanked), and recommends appropriate disposition for all. Blanking of identified nozzles should be accomplished by Project W-314 upon installation of jumpers and acceptance by Tank Waste Remediation System (TWRS) Tank Farm Operations.


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/2261109641
Back to Top

Document information

Published on 01/01/1998

Volume 1998, 1998
DOI: 10.2172/10148339
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?