m (Scipediacontent moved page Draft Content 978941599 to Colt 2008a)
 
Line 3: Line 3:
  
 
ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Subtask 41817.333.01.01'. The pipeline would carry CO{sub 2} and N{sub 2}-H{sub 2} from a synthetic gas plant on the western side of Cook Inlet to Agrium's facility. The economic analysis determined that the net present value of the total capital and operating lifecycle costs for the pipeline ranges from $318 to $588 million. The greatest contributor to this spread is the cost of electricity, which ranges from $0.05 to $0.10/kWh in this analysis. The financial analysis shows that the delivery cost of gas may range from $0.33 to $0.55/Mcf in the first year depending primarily on the price for electricity.
 
ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Subtask 41817.333.01.01'. The pipeline would carry CO{sub 2} and N{sub 2}-H{sub 2} from a synthetic gas plant on the western side of Cook Inlet to Agrium's facility. The economic analysis determined that the net present value of the total capital and operating lifecycle costs for the pipeline ranges from $318 to $588 million. The greatest contributor to this spread is the cost of electricity, which ranges from $0.05 to $0.10/kWh in this analysis. The financial analysis shows that the delivery cost of gas may range from $0.33 to $0.55/Mcf in the first year depending primarily on the price for electricity.
 
Document type: Report
 
 
== Full document ==
 
<pdf>Media:Draft_Content_978941599-beopen367-7718-document.pdf</pdf>
 
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc934929/m2/1/high_res_d/963355.pdf https://digital.library.unt.edu/ark:/67531/metadc934929/m2/1/high_res_d/963355.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc934929/m2/1/high_res_d/963355.pdf https://digital.library.unt.edu/ark:/67531/metadc934929/m2/1/high_res_d/963355.pdf]
  
* [https://core.ac.uk/display/71335736 https://core.ac.uk/display/71335736],[http://www.osti.gov/servlets/purl/963355-qdpoXU http://www.osti.gov/servlets/purl/963355-qdpoXU],[https://academic.microsoft.com/#/detail/54057989 https://academic.microsoft.com/#/detail/54057989]
+
* [https://core.ac.uk/display/71335736 https://core.ac.uk/display/71335736],
 +
: [https://www.osti.gov/servlets/purl/963355 https://www.osti.gov/servlets/purl/963355],
 +
: [https://academic.microsoft.com/#/detail/54057989 https://academic.microsoft.com/#/detail/54057989]

Latest revision as of 12:55, 22 January 2021

Abstract

ISER was requested to conduct an economic analysis of a possible 'Cook Inlet Syngas Pipeline'. The economic analysis was incorporated as section 7.4 of the larger report titled: 'Beluga Coal Gasification Feasibility Study, DOE/NETL-2006/1248, Phase 2 Final Report, October 2006, for Subtask 41817.333.01.01'. The pipeline would carry CO{sub 2} and N{sub 2}-H{sub 2} from a synthetic gas plant on the western side of Cook Inlet to Agrium's facility. The economic analysis determined that the net present value of the total capital and operating lifecycle costs for the pipeline ranges from $318 to $588 million. The greatest contributor to this spread is the cost of electricity, which ranges from $0.05 to $0.10/kWh in this analysis. The financial analysis shows that the delivery cost of gas may range from $0.33 to $0.55/Mcf in the first year depending primarily on the price for electricity.


Original document

The different versions of the original document can be found in:

https://www.osti.gov/servlets/purl/963355,
https://academic.microsoft.com/#/detail/54057989
Back to Top

Document information

Published on 01/01/2008

Volume 2008, 2008
DOI: 10.2172/963355
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?