(Created page with " == Abstract == This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Ce...") |
m (Scipediacontent moved page Draft Content 448337012 to Faultersack et al 2002a) |
(No difference)
|
This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.
The different versions of the original document can be found in:
Published on 01/01/2002
Volume 2002, 2002
DOI: 10.2172/910971
Licence: CC BY-NC-SA license
Are you one of the authors of this document?