You do not have permission to edit this page, for the following reason:

You are not allowed to execute the action you have requested.


You can view and copy the source of this page.

x
 
1
2
== Abstract ==
3
4
Trafikverket analyzes railroad capacity in Sweden. Capacity utilization is calculated annually for the whole system. Capacity utilization remains high in the Swedish railroad network. This paper describes the implementation of the common European standard (for capacity utilization) that the Capacity Leaflet UIC 406 describes. The paper also discusses the Southern Main Line that connects Malmo and Stockhom, in Sweden. The Southern Main Line was congested in 2011. The paper describes the methods used to analyze and aid the congested line.
5
6
7
== Original document ==
8
9
The different versions of the original document can be found in:
10
11
* [http://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf http://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf]
12
13
* [http://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf http://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf],
14
: [http://dx.doi.org/10.2495/cr120301 http://dx.doi.org/10.2495/cr120301]
15
16
* [https://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf https://www.witpress.com/Secure/elibrary/papers/CR12/CR12030FU1.pdf],
17
: [https://www.witpress.com/elibrary/wit-transactions-on-the-built-environment/127/23874 https://www.witpress.com/elibrary/wit-transactions-on-the-built-environment/127/23874],
18
: [https://trid.trb.org/view.aspx?id=1254967 https://trid.trb.org/view.aspx?id=1254967],
19
: [https://academic.microsoft.com/#/detail/2002074571 https://academic.microsoft.com/#/detail/2002074571]
20

Return to Grimm 2012a.

Back to Top

Document information

Published on 01/01/2012

Volume 2012, 2012
DOI: 10.2495/cr120301
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?