Abstract

The 100-B-21:2 waste site consists of the immediate area of the DS-100BC-02 pipeline. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that [...]

Abstract

The 600-233 waste site consisted of three small-diameter pipelines within the 600-232 waste site, including previously unknown diesel fuel supply lines discovered during site remediation. The 600-233 waste site has been remediated to achieve the remedial action objectives specified [...]

Abstract

The 100-F-26:15 waste site consisted of the remnant portions of underground process effluent and floor drain pipelines that originated at the 105-F Reactor. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed [...]

Abstract

The 100-B-24 Spillway is a spillway that was designed to serve as an emergency discharge point for the 116-B-7 outfall in the event that the 100-B-15 river effluent pipelines were blocked, damaged, or undergoing maintenance. The site meets the remedial action objectives specified [...]

Abstract

The 100-F-26:10 waste site includes sanitary sewer lines that serviced the former 182-F, 183-F, and 151-F Buildings. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling [...]

Abstract

The 100-F-46 french drain consisted of a 1.5 to 3 m long, vertically buried, gravel-filled pipe that was approximately 1 m in diameter. Also included in this waste site was a 5 cm cast-iron pipeline that drained condensate from the 119-F Stack Sampling Building into the 100-F-46 french [...]