Abstract
[EN] Nowadays one of the main priorities for metro line operators is the reduction of energy consumption, due to the environmental impact and economic cost. In order to achieve this objective different strategies can be applied, normally focused into rolling stock, infrastructure and/or operation. Considering short-term measures and related to the traffic operation strategies, different approaches are being researched. One of the most effective strategy which reduce net energy consumption is the use of efficient driving techniques. These techniques produces a speed profile between two stations that requires the minimum net energy consumption, without degrading commercial running times or passenger comfort. In this paper, a computer model for calculating the metro vehicles speed profiles minimizing the energy consumption was developed. The equations considered in the model represent the behavior of a single vehicle operated under manual driving, subject to different constraints such as the headway, cycle time, distances and acceleration limits. The proposed model calculates different commands to be systematically executed by the driver. The resulting simulator has been tuned by means of on board measurements of speed, accelerations and energy consumption obtained along different lines in Metro de Valencia network. For this purpose, different scenarios are analyzed to assess the achievable energy savings. In general terms and comparing with the actual energy consumption, the solutions proposed can reduce the net energy consumption around 19% The authors wish to thank Ferrocarrils de la Generalitat Valenciana (FGV) for their kind support during the development of this study, including their assistance during the installation of the consumption devices aboard their trains and their permission to carry out measurements during the normal service. This project has by funded by the Spanish Ministry of Economy and Competitiveness (Ref. TRA2011-26602). Villalba Sanchis, I.; Salvador Zuriaga, P. (2016). An energy-efficient metro speed profiles for energy savings: application to the Valencia metro. En XII Congreso de ingenierÃa del transporte. 7, 8 y 9 de Junio, Valencia (España). Editorial Universitat Politècnica de València. 1820-1832. https://doi.org/10.4995/CIT2016.2016.3774 OCS 1820 1832Abstract
[EN] Nowadays one of the main priorities for metro line operators is the reduction of energy consumption, due to the environmental impact and economic cost. In order to achieve this objective different strategies can be applied, normally focused into rolling stock, infrastructure [...]Abstract
Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2015 Thesis (M.Sc.) -- İstanbul Technical University, Instıtute of Science and Technology, 2015 Metro depo sahasında; araçların park edilmesi, işletilmesi, temizliği, bakım ve onarımı, tamir ve yenilenmesi, günlük bakımı, malzemelerin sağlanması gibi gereksinimleri karşılayacak tesisler bulunmaktadır. Bu tesislerin tasarımı yapılarken dikkat edilmesi gereken birçok etken ve tasarım ölçütü vardır. Bu tez çalışmasında öncelikli olarak İstanbul’daki metro hatlarından ve bu metro hatlarının depo sahalarından söz edilmiştir. Ardından metro depo sahasının tanımı ve bileşenleri açıklanmış, metro depo sahası tasarımını etkileyen etkenler ve tasarım ölçütleri sıralanmıştır. Daha sonra İstanbul Üsküdar-Ümraniye-Çekmeköy metro hattı depo sahası anlatılarak, ihale dokümanındaki uygulamaya esas kesin proje tasarımı incelenmiş ve yeni bir metro depo sahası ön proje tasarımı geliştirilmiştir. Elde edilen sonuçlar belirlenerek, metro depo sahası tasarımı yapılırken göz önünde bulundurulması gereken yeni öneri ve yaklaşımlar getirilmiştir. Metro depo sahası tasarımını etkileyen etkenler; konum ve yer seçimi, işletme, atölye binası ve bakım hizmetleri, araç park hatları, metro araç özellikleri, karayolu bağlantısı, şehir ve çevre etkileşimi, metro depo sahası bağlantı yolu, güvenlik, elektromekanik sistemler, altyapı, üstyapı ve hat geometrisi olarak sıralanabilir. Tasarım ölçütleri olarak, metro hattı tasarım ölçütleri, atölye yapıları tasarım ölçütleri, çevresel gürültü ve çevresel titreşim ölçütleri dikkate alınmalıdır. Depo sahasının konumu ve yeri seçilirken, hizmet edeceği metro hatlarına yakın olmasına dikkat edilmelidir. Seçilen arazinin, istenilen tesislerin yerleşimine uygun koşullarda, büyüklükte olması ve topoğrafyasının engebesiz olması gerekir. İşletme için kumanda ve kontrol merkezinin bulunduğu, bütün metro hattı ve depo sahasının denetiminin yapıldığı bir işletme binası tesis edilmelidir. İşletme binası ve tesisleri tasarlanırken, tüm işletme senaryolarına uygun ve elverişli yerleşimler yapılmalıdır. Atölye binası ve bakım hizmetleri, bütün araçlara servis sağlayabilecek kapasiteye göre belirlenir. Çift taraftan girişli atölye binası tasarımı daha çok tercih edilse de, arazinin durumuna göre tek taraftan girişli atölye binası da tasarlanabilir. Metro depo sahasının ana amacı metro araçlarına hizmet vermek olduğu için, araç özelliklerine göre bütün tesisler şekillenir. Araçların statik ve dinamik gabarisi, uzunlukları ve kullanılabildikleri hat geometrisi özelliklerine göre, dolanım hatlarının, atölye hatlarının, park hatlarının ve tesislerin yerleşimi yapılır. Karayolu bağlantıları sayesinde depo sahası çalışanlarının ulaşımı, malzeme temini ve metro araçlarının depo sahasına ulaşımı sağlanabilir. Acil durumlarda karayolunu kullanacak acil durum ekiplerinin araçlarına uygun olarak karayolu tasarımlarının yapılmasına dikkat edilmelidir. Şehir ile uyum içerisinde, gürültü ve titreşimlerin denetim altında tutulduğu, atıkların toplanması ve bertarafı için çevreci tesislerin kurulduğu, kirlenmiş suların arıtıldığı ve çevreci bir drenaj sisteminin bulunduğu bir depo sahası tasarımı yapılarak çevre etkileri azaltılmalıdır. Bağlantı yolu; metro hattı ile depo sahası arasındaki ulaşım güvenilirliğini sağlamalı, bir aksaklık durumunda farklı güzergahlarla ulaşım devam etmelidir. Depo sahasının güvenliği için giriş ve çıkışlar denetim altında tutulmalı, izinsiz girişleri engellemek için duvar ve çitlerle arazinin çevresi korunmalıdır. Can güvenliği için insanların araç hatlarına geçişi sınırlandırılmalıdır. Araçların cer gücünü karşılayacak cer trafo merkezi ve uygun katener sistemleri tasarlanıp, araçları denetlemek ve trafik akışını sağlamak için sinyalizasyon donanımları tesis edilmelidir. Altyapı için uygun malzeme seçilerek, gerekli olan şev ve duvar yerleşimleri yapılmalıdır. Yeraltı suyu ve yağmur suyunun denetimi drenaj sistemi ile sağlanarak zeminin kararlılığı korunmalıdır. Depo sahasının yapısına göre balastlı ya da balastsız üstyapı tipi seçilerek tasarım şekillenir. Yapılar içerisinde bulunan hatlar daha çok balastsız üstyapı tipinde yapılırken, doğal zemin üzerinde bulunan hatlar çoğunlukla balastlı üstyapı tipinde yapılmaktadır. Hat geometrisi, depo sahası yerleşimini en çok etkileyen etken olduğu için, yatay ve düşey geometri tasarımları dikkatle yapılmalıdır. Metro araçlarının özelliklerine uygun ve hizmet kapasitesini düşürmeyen özellikte, yatay ve düşey geometri elemanları ile makaslar belirlenip tasarımlar yapılmalıdır. Tasarımı etkileyen etkenlerin yanı sıra, tasarıma ilişkin belirlenmiş olan ölçütler de göz önünde bulundurulmalıdır. Metro depo sahası hatları; hat tasarım ölçütlerine bakılarak, hat geometrisinde istenen şartları sağlamalıdır. Atölye yapıları tasarım ölçütleri de dikkate alınarak, atölye gereksinimleri ve alanları belirlenir ve atölye tasarımı tamamlanabilir. Metro hatları ve depo sahaları yerleşim yerlerinde bulunduğu için, çevreye verdiği rahatsızlıkları belirli seviyelerin altında tutmak amacıyla, çevresel gürültü ve çevresel titreşim ölçütleri dikkate alınmalıdır. Metro depo sahası tasarımını etkileyen bu etkenler ve ölçütler ışığında, Üsküdar-Ümraniye-Çekmeköy metro hattı depo sahası için ihale dokümanında hazırlanmış olan uygulamaya esas kesin proje tasarımı incelenmiş, eksiklikleri belirlenmiş ve yerine yeni bir ön proje tasarımı hazırlanmıştır. Üsküdar-Ümraniye-Çekmeköy metro hattı depo sahası için topoğrafyası engebeli bir arazi ayrılmıştır. Hat, İstanbul’un yoğun yerleşim bölgesinde planlandığı için, depo sahasının yapılabileceği uygun bir arazi bulmak zordur. Kamulaştırma bedellerinin yüksek olması ve kamulaştırmalara karşı açılan davaların uzun yıllar boyunca sürmesi de göz önünde bulundurulduğunda, elde olan arazinin kullanılmasına karar verilmiştir. Daha etkili ve verimli bir şekilde arazi kullanımı sağlamak amacıyla, 110 m ve 120 m olmak üzere iki ayrı kotta, kademeli bir şekilde depo sahası tasarımları yapılmıştır. Tam otomatik sürücüsüz sistem ile işletim için, gerekli kumanda ve kontrol merkezi, sinyal sistemi ve hat tasarımı ile depo sahası tasarımları düzenlenmiştir. Atölye bakım hatları ve atölye binası içindeki teknik alanlar, ilgili ölçütler dikkate alınarak yeniden tasarlanmış, ortaya daha büyük ve yüksek kapasiteli bir atölye tesisi çıkmıştır. Araç park hatlarının sayısı 33’ten 68’e çıkarılmıştır. Alınacak araçlar belirlenerek, araç özellikleri tasarımlarda göz önüne alınmıştır. Depo sahasını kullanan metro hatlarının girişleri birbirinden ayrılarak, işletme açısından ortaya çıkabilecek karışıklıkların ve oluşabilecek araç trafiğinin önüne geçilmiştir. İtfaiye araçlarının ve büyük tırların kullanımına uygun, depo sahası içerisindeki bütün tesislerin ulaşımını sağlayan karayolu bağlantıları yapılmıştır. Tam otomatik sürücüsüz sistemde güvenlik sorunları çıkaracak hemzemin geçişler kaldırılmış, yalnızca araçların elle kumanda edildiği atölye girişlerinde hemzemin geçişler konulmuştur. Gürültü ve titreşim azaltıcı çözümler getirilmiş, çevreci bir drenaj ve atık kaldırma sistemleri tasarlanmıştır. Metro hatları ile depo sahası arasındaki ulaşım güvenilirliğini sağlayacak, farklı güzergahlarla ulaşım sağlayabilen bağlantı yolları tasarlanmıştır. 800 m uzunluktaki test hattı bağlantı yolu üzerine yerleştirilmiştir. Tesisin güvenliği için yüksek duvar ve tel çitler konulup, kameralarla denetim sağlayabilecek tasarımlar sunulmuş, can güvenliği için hatlara insan erişimini engelleyecek tel çitler yerleştirilmiştir. Araçlara cer gücünü sağlayacak trafo merkezi ve rijit katener sistemi hazırlanmış, elektrik kesintisinde hizmete girecek bir kojeneratör sistemi tasarımlara eklenmiştir. UIC 54 (54 E 1) tipi ray ve ön germeli beton travers ile balastlı üstyapı sistemi kurularak depo sahası yerleşimleri yapılmıştır. Atölye binası içindeki bakım hatları için, betona gömülü oluklu ray ile balastsız üstyapı sistemi seçilmiş ve iki katlı park hatları binasının alt katındaki park hatlar için, betona sabit balastsız üstyapı sistemi seçilmiştir. Hat geometrileri tasarlanırken, arazi koşulları nedeniyle düşey geometri ölçütleri aşılmak zorunda kalınmıştır. Çekici araçların bu düşey geometri koşullarına uyumlu olması ve yeterli güce sahip olması durumunda, ortaya çıkabilecek olumsuzlukların önüne geçilebilir. En küçük yatay kurp yarıçapı 80 m, en küçük düşey kurp yarıçapı 2000 m, en büyük eğim %4 ve makas tipi 1/7 R 140 seçilerek tasarımlar yapılmıştır. Metro depo sahası tasarımları yapılırken, işletmenin gereksinimleri, araç özellikleri önceden bilinmeli ve tasarım ona göre şekillenmelidir. Daha verimli olan tam otomatik sürücüsüz sistem tercih edilmelidir. Depo sahasında hız ve konforun düşük olması ve yerleşim bölgesinde uygun arazi yapısı olan bir alanın bulunmasının zor olması göz önünde bulundurularak, hat geometrisi ölçütleri ve standartları konusunda daha esnek olunmalıdır. Metro depot area is needed to include operating, cleaning, maintenance and repair, overhaul, material requisition and parking areas for vehicles. Designing these facilities, many factors and criteria have to be taken into account. First of all, Istanbul metro lines and their depot areas are mentioned in this thesis study. Then designing factors and criteria for a metro depot area are highlighted. Afterwards, final design project in the contract of Istanbul Uskudar-Umraniye-Cekmekoy metro line is being analyzed and a new conceptual design project for metro depot area is being developed. Finally, by taking into consideration of the results indicated, new suggestions and aspects about metro depot design are being made. Factors for designing metro depot area are; location and site selection, operation, workshop and maintenance services, parking tracks, vehicle features, rood connection, city and environment interaction, access tracks, security, electromechanical systems, infrastructure, superstructure and track geometry parameters. Criterion of track design, criterion of workshop design and criterion of environmental noise and vibration are needed to be taken in consideration as design criterions. Metro depot area is needed to be close to the metro lines which are being connected. The area is needed to be appropriate and big enough for the selected facilities, and smooth terrain are better to establish the facilities. Operation building and facilities are being designed and areas are being selected which are appropriate and sufficient for entire operational scenarios and have control center. Requests of operator firm are being considered in the name of not having trouble during operation. The capacity of workshop and maintenance services is determined regarding to the serving to metro vehicles. Double entry workshop is generally being preferred. However, single entry workshop may be designed according to the field situation. As the main purpose of a metro depot area is serving to metro vehicles, the facilities are designed according to properties of metro vehicles. Settlement of the tracks, workshop and the other facilities are being done accordingly static and dynamic gauge, length of the vehicles and properties of appropriate track geometry. Proper highway connections are needed for the transportation of workers, materials and metro vehicles. Rood design is necessary in the state of emergency for the emergency response vehicles using the roods. In concordance with city, controlling over the noise and vibration are required by designing of depot area. Environmental impacts are being reduced by compatibility with city and environmental, keeping under control environmental noise and vibration, storage and disposal of wastes, treatment of waste water and ecological drainage systems. Access tracks provides security between metro line and depot area and in case of trouble it should be maintained the transportation with different routes. For the security of depot area, entry and exit points are needed to be controlled and protected with hedges and walls against intrusions. Access of people to track corridors should be limited for security of life. Traction transformer and appropriate catenary systems are being designed to meet the traction force of vehicles. Necessary facilities for signage systems are being established on behalf of controlling the vehicles and traffic stream. Required side slopes and retaining walls settlements are being done by selecting the proper material for infrastructure. Infrastructure design is needed to be developed by providing drainage system to control groundwater and storm water. The stability of soil could be provided by means of drainage system. Design is being shaped by selecting ballasted track or ballastless track according to the configuration of depot area. Generally, tracks in building are ballastless and tracks on soil are ballasted. Track geometry is the main factor on settlement of a depot area. Tracks are being settled by horizontal and vertical geometry design and selection of turnout geometry which are appropriate for depot area. These geometries are needed to be appropriate for vehicles and nonrestrictive for the capacity of metro depot area. Beside of these factors, regarding design criterions is required to be considered. Preferred conditions on track geometry are being provided thereby the design criterions of track geometry. Design of workshop can be completed by determining the necessity and area of workshop considering workshop design criterions. To keep under control environmental disturbance, environmental noise and environmental vibration criterions are needed to be considered. The final design project in the contract of Istanbul Uskudar-Umraniye-Cekmekoy metro line is being analyzed and its deficiencies are being disclosed in the light of design criterions and factors of metro depot. In place of this design, new conceptual design project is being developed. Metro depot area in the project has rugged terrain. Since the metro line is projected on intensive residential area of Istanbul, it is hard to find an appropriate land for depot area. Because of high level of expropriated price and long cases against expropriation, it is decided to continue to work on same land. Therefore, with the purpose of efficiently usage of the land, depot area is being designed by arranging land on two different elevations which are 110m and 120m. Design of the depot area is arranged by control center, signal system and track design for unmanned full-automatic operation system. Capacity of workshop building and depot area is expanded by integrating two workshop building in different areas. Daily cleaning services are taken to parking tracks. Number of vehicle parking lines is increased from 33 to 68. New design project is shaped regarding to properties of metro vehicles. Depot area entrance of subway lines is being separated for the purpose of preventing disorder and potential vehicle traffic. A new road design is being developed for the usage of fire trucks and trailer trucks. All facilities are connected with road. Level crossings are settled only at the entrances of workshop which vehicles controlled manually to avoid safety problems on unmanned full-automatic operation system. Ecological drainage systems, storage and disposal of wastes and equipment for restriction of environmental noise and vibration are designed. Access roads are planned to provide reliability of transportation between metro lines and depot area and also different routes. 800-meter-long test track is settled on access road. Razor wire and wire fences on high walls and monitor system are designed for the security of properties. For the security of life, wire fences are put to prevent access to tracks. A transformer and rigid catenary system are prepared to provide traction force for vehicles. A cogenerator system is added to design to put into service in case of power cut. Ballasted track system with UIC 54 (54 E 1) type rail and pre-stressed concrete sleeper are selected and settled. In the workshop building, superstructure should be as flange rail embedded in concrete. On ground floor of parking building, superstructure should be as ballastless track. Because of condition of terrain, it is contravened vertical geometry criterions. To prevent problems of this situation, shunting vehicle is needed to be proper to the vertical geometry. The minimum radius of horizontal curve as 80 m, the minimum radius of vertical curve as 2000 m, the maximum slope as 4% and turnout type as 1/7 R 140 are selected then design is prepared. By designing a metro depot area, requirements of the operating firm, properties of vehicles should be known before designing period and design is needed to be shaped accordingly. Unmanned full-automatic operation system should be selected for further efficiency. The speed and comfort in the depot area is restricted, and it is hard to find an appropriate land in urban area. Therefore, flexibility is needed on criterions and standards of track geometry. Yüksek Lisans M.Sc.Abstract
Tez (Yüksek Lisans) -- İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, 2015 Thesis (M.Sc.) -- İstanbul Technical University, Instıtute of Science and Technology, 2015 Metro depo sahasında; araçların park edilmesi, işletilmesi, temizliği, bakım ve onarımı, tamir [...]Abstract
International audience; Line 1 of BRT, the first line of BRT system in Iran, and line 4 of Subway, designed as a sustainable transport system and constructed afterwards, have common path of 10 km length in the most congested area of the capital. This pioneer BRT line has the maximum record among all BRT lines in Tehran. Its success caused lower funds allocation and less attention to the planning and implementation of the line 4 of Subway. As a result currently line 4 of Subway works at 35% of its capacity with only 13 car-trains and the headway of 7-10 min. Construction investment in the subway line 4 was about 11 times more than in the line 1 of BRT. Thus, postponing of investments to the line 4 of Subway causes 65% of its infrastructure capacity to be unused. However, the elimination for BRT line appears logical, it’s important to avoid negative social impact, as this is a fact that the citizens of Tehran usually have fractal character, so that little changes in their behavior needs long time and enough desirability. Additional funds should also be found for the line 4 of Subway while budgets are saturated and other lines, considering existing demand, are in priority. Therefore, Tehran nowadays is brought to find remedial solutions to transport challenges: to align short-term and long-term sustainable solutions in order to achieve its economic, social and environmental goals.Abstract
International audience; Line 1 of BRT, the first line of BRT system in Iran, and line 4 of Subway, designed as a sustainable transport system and constructed afterwards, have common path of 10 km length in the most congested area of the capital. This pioneer BRT line has the maximum [...]Abstract
von Alexander Litzellachner Zusammenfassung in deutscher Sprache Technische Universität Wien, Diplomarbeit, 2017Abstract
presente pesquisa analisará as características das políticas de transporte coletivo no Município de São Paulo, entre os anos de 2001 e 2010. Partindo do entendimento do modelo de desenvolvimento urbano vigente, o qual priorizou o transporte privado sobre rodas, individual, além de um perfil sócio-espacial segregador procuraremos definir quais foram as principais ações realizadas neste setor, considerando: a evolução histórica das políticas de transporte a partir do início do século XX; principais políticas públicas de transporte a partir de 2001 (implementações de corredores de ônibus, integração de modais, implantação de bilhete único etc); análise das repercussões destas políticas na dinâmica concreta da mobilidade urbana. Também pretendemos interpretar as relações das administrações municipais que governaram a cidade nesse período (gestão Marta Suplicy 2001 - 2004 - gestão José Serra/Gilberto Kassab 2005 - 2008 - e gestão Gilberto Kassab 2009 - 2010) com os principais agentes urbanos envolvidos (elite política municipal, empresários e empreendedores urbanos, sociedade civil e usuários de transportes públicos e privados, principalmente) e outros grupos de interesse, analisando de que maneira e por meio de quais instrumentos as políticas públicas de mobilidade urbana foram desenvolvidas. This research aims to analyze the characteristics of collective transportation policies in São Paulo, between 2001 and 2010. Based on the understanding of the current urban development model, which gave priority to individual and private transport on wheels, as well as a socio-spatial segregated role - we will try to define what were the main actions undertaken in this sector, considering: the historical evolution of transport policies from the early twentieth century, major public transport policy since 2001 (implementation of bus corridors, modal integration, implementation of the Bilhete Único ticket etc.), analysis of the impact of these policies on the dynamics of the urban mobility. We also intend to interpret the relationships between the municipal administrations that governed the city during this period (governments of Suplicy - 2001 2004, Serra / Gilberto Kassab - 2005 2008, and Gilberto Kassab - from 2009 to 2010) with the main agents involved with the urban dynamics (municipal political elite, businessmen and urban entrepreneurs, civil society and users of public and private transport, mainly) and other interest groups, analyzing how and through which instruments the urban mobility public policies have been developed.Abstract
presente pesquisa analisará as características das políticas de transporte coletivo no Município de São Paulo, entre os anos de 2001 e 2010. Partindo do entendimento do modelo de desenvolvimento urbano vigente, o qual priorizou o transporte privado sobre rodas, individual, além [...]Abstract
The paper introduces the main concepts and criteria presented in the Guidelines on the Analysis, Conservation and Structural Restoration elaborated by the ICOMOS/ISCARSAH committee. The guidelines have been developed with the aim to provide guidance to experts and practitioners working in the study and conservation of structures or the architectural heritage. The guidelines are based on the ICOMOS Charter on the Principles for he Analysis, Conservation and Structural Restoration of Architectural Heritage elaborated by ISCARSAH and adopted by ICOMOS in 2003. The guidelines are intended to assist the multidisciplinary teams involved in the management of historical structures across all the stages of the study and operation, including the investigation and documentation works, the structural verification and the selection and design of appropriate minimum interventions.Abstract
The paper introduces the main concepts and criteria presented in the Guidelines on the Analysis, Conservation and Structural Restoration elaborated by the ICOMOS/ISCARSAH committee. The guidelines have been developed with the aim to provide guidance to experts and practitioners working [...]