Abstract

The 100-B-21:2 waste site consists of the immediate area of the DS-100BC-02 pipeline. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that [...]

Abstract

This document is meant to describe the status of the International Energy Agency (IEA), Annex 11 (Integrated Systems), Subtask B (Analytical Tools) effort being carried out by the Member Nations. This includes Canada, Japan, Italy (inactive at this time), the Netherlands, Spain, Switzerland, [...]

Abstract

RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim [...]

Abstract

This document is meant to describe the status of the International Energy Agency (IEA), Annex 11 (Integrated Systems), Subtask B (Analytical Tools) effort being carried out by the Member Nations. The goal of this Annex is to identify, compile, and integrate models of hydrogen technology [...]