Abstract

This report presents the methods and results of calculations performed to predict the critical velocity and pressure drop required for the two-inch pipeline transfer of solid/liquid waste slurry from underground waste storage Tank 241-SY-101 to Tank 241-SY- 102 at the Hanford Site. [...]

Abstract

This study assesses five steps for Tank 241-AN-105 waste retrieval and subsequent pipeline transfer: 1. Remove supernatant liquid waste from AN-105 and transfer it through a pipeline with inline dilution with water (1st liquid waste transfer). 2. Add water (as a diluent) to Tank AN-105. [...]