Abstract

The first buried asbestos-cement (Transite) pipeline used in high temperature (approximately 300/sup 0/F) service for transport of geothermal fluids was installed in the fall of 1975, and has seen 1/sup 1///sub 2/ years of service. The line is 4000 ft long, between the deep geothermal [...]

Abstract

Past observations showed that pipeline damages in liquefaction zones are significantly higher than the damages in areas where there was no liquefaction. Existing vulnerability relationships for the pipelines in liquefaction zones utilize parameters such as ground displacement, horizontal [...]

Abstract

Recent earthquakes show that pipeline damage is severe in the areas where permanent ground deformations (e.g., liquefaction zones) occur. Ground movement hazard to pipeline systems can be assessed by using ground displacement measurements around the location of pipelines. There are [...]