The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le
+
The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le
  
  

Latest revision as of 19:17, 25 January 2021

Abstract

The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/2053361729
Back to Top

Document information

Published on 01/01/1994

Volume 1994, 1994
DOI: 10.2172/10169419
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?