The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le
 
The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le
 
Document type: Report
 
 
== Full document ==
 
<pdf>Media:Draft_Content_410805479-beopen458-1805-document.pdf</pdf>
 
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc1389310/m2/1/high_res_d/10169419.pdf https://digital.library.unt.edu/ark:/67531/metadc1389310/m2/1/high_res_d/10169419.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc1389310/m2/1/high_res_d/10169419.pdf https://digital.library.unt.edu/ark:/67531/metadc1389310/m2/1/high_res_d/10169419.pdf]
  
* [http://www.osti.gov/scitech/servlets/purl/10169419 http://www.osti.gov/scitech/servlets/purl/10169419],[https://academic.microsoft.com/#/detail/2053361729 https://academic.microsoft.com/#/detail/2053361729]
+
* [http://www.osti.gov/scitech/servlets/purl/10169419 http://www.osti.gov/scitech/servlets/purl/10169419],
 +
: [https://academic.microsoft.com/#/detail/2053361729 https://academic.microsoft.com/#/detail/2053361729]

Revision as of 12:41, 22 January 2021

Abstract

The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received cell drainage from Tank 5-2 in the 221-U Building nd waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank. From June 1957 to July 1957, the site received waste from the 224-U Building via the overflow from the 241-U-361 Settling Tank and contaminated solvent from the 276-U Settling Tank solvent storage area. The discharge of 221-U waste was discontinued during shutdown of production operations. From July 1957 to May 1967, the site received waste from the 224-U Building and equipment decontamination and reclamation wastes from operations in the 221-U Building canyon. The scope of work is encompassed in five steps: (1) obtaining access to the pipeline in order to perform an in-line camera survey of the line to the greatest extent possible, (2) evaluating the need for further investigation of the pipeline, (3) blanking the line, as needed, to perform a pressure test, (4) conductingmore » the pressure test, as needed, and (5) documenting the ability of the line to maintain pressure.« le


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/2053361729
Back to Top

Document information

Published on 01/01/1994

Volume 1994, 1994
DOI: 10.2172/10169419
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?