== Abstract ==
 
== Abstract ==
  
This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversionmore » box catch tank which has been removed from service.« le
+
This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversionmore » box catch tank which has been removed from service.« le
 
+
Document type: Report
+
 
+
== Full document ==
+
<pdf>Media:Draft_Content_892004951-beopen420-2748-document.pdf</pdf>
+
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc1274294/m2/1/high_res_d/10118790.pdf https://digital.library.unt.edu/ark:/67531/metadc1274294/m2/1/high_res_d/10118790.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc1274294/m2/1/high_res_d/10118790.pdf https://digital.library.unt.edu/ark:/67531/metadc1274294/m2/1/high_res_d/10118790.pdf]
  
* [https://www.osti.gov/servlets/purl/10118790 https://www.osti.gov/servlets/purl/10118790],[https://academic.microsoft.com/#/detail/17583633 https://academic.microsoft.com/#/detail/17583633]
+
* [https://www.osti.gov/servlets/purl/10118790 https://www.osti.gov/servlets/purl/10118790],
 +
: [https://academic.microsoft.com/#/detail/17583633 https://academic.microsoft.com/#/detail/17583633]

Latest revision as of 18:58, 25 January 2021

Abstract

This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversionmore » box catch tank which has been removed from service.« le


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/17583633
Back to Top

Document information

Published on 01/01/1995

Volume 1995, 1995
DOI: 10.2172/10118790
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?