<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
		<id>https://www.scipedia.com/wd/index.php?action=history&amp;feed=atom&amp;title=Bank_2015d</id>
		<title>Bank 2015d - Revision history</title>
		<link rel="self" type="application/atom+xml" href="https://www.scipedia.com/wd/index.php?action=history&amp;feed=atom&amp;title=Bank_2015d"/>
		<link rel="alternate" type="text/html" href="https://www.scipedia.com/wd/index.php?title=Bank_2015d&amp;action=history"/>
		<updated>2026-05-07T06:32:59Z</updated>
		<subtitle>Revision history for this page on the wiki</subtitle>
		<generator>MediaWiki 1.27.0-wmf.10</generator>

	<entry>
		<id>https://www.scipedia.com/wd/index.php?title=Bank_2015d&amp;diff=186389&amp;oldid=prev</id>
		<title>Scipediacontent: Scipediacontent moved page Draft Content 657063473 to Bank 2015d</title>
		<link rel="alternate" type="text/html" href="https://www.scipedia.com/wd/index.php?title=Bank_2015d&amp;diff=186389&amp;oldid=prev"/>
				<updated>2021-01-25T16:36:09Z</updated>
		
		<summary type="html">&lt;p&gt;Scipediacontent moved page &lt;a href=&quot;/public/Draft_Content_657063473&quot; class=&quot;mw-redirect&quot; title=&quot;Draft Content 657063473&quot;&gt;Draft Content 657063473&lt;/a&gt; to &lt;a href=&quot;/public/Bank_2015d&quot; title=&quot;Bank 2015d&quot;&gt;Bank 2015d&lt;/a&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left&quot; data-mw=&quot;interface&quot;&gt;
				&lt;tr style='vertical-align: top;' lang='en'&gt;
				&lt;td colspan='1' style=&quot;background-color: white; color:black; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan='1' style=&quot;background-color: white; color:black; text-align: center;&quot;&gt;Revision as of 16:36, 25 January 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan='2' style='text-align: center;' lang='en'&gt;&lt;div class=&quot;mw-diff-empty&quot;&gt;(No difference)&lt;/div&gt;
&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</summary>
		<author><name>Scipediacontent</name></author>	</entry>

	<entry>
		<id>https://www.scipedia.com/wd/index.php?title=Bank_2015d&amp;diff=186388&amp;oldid=prev</id>
		<title>Scipediacontent: Created page with &quot; == Abstract ==  In an effort to further develop the             South East Europe transport observatory (SEETO)             comprehensive network, integrate it in the Europea...&quot;</title>
		<link rel="alternate" type="text/html" href="https://www.scipedia.com/wd/index.php?title=Bank_2015d&amp;diff=186388&amp;oldid=prev"/>
				<updated>2021-01-25T16:36:05Z</updated>
		
		<summary type="html">&lt;p&gt;Created page with &amp;quot; == Abstract ==  In an effort to further develop the             South East Europe transport observatory (SEETO)             comprehensive network, integrate it in the Europea...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&lt;br /&gt;
== Abstract ==&lt;br /&gt;
&lt;br /&gt;
In an effort to further develop the             South East Europe transport observatory (SEETO)             comprehensive network, integrate it in the European Union’s             (EU) Trans-European transport (TEN-T) network and strengthen             the underlying transport planning systems, a grant was             awarded by the Western Balkans infrastructure framework             (WBIF) for the update of the regional Balkans infrastructure             study (REBIS). The motivation for the update was the fact             that since the completion of REBIS in 2003, there had been             no review or update of the study’s projections and             recommendations that will in turn enable an informed             assessment and updating of the regional priorities for             investment in the SEETO comprehensive network. The main             objective of the REBIS update was to develop a priority             action plan for enhancing the efficiency of the SEETO             comprehensive network. The action plan identifies priority             physical investments as well as non-physical improvements             including regulatory, institutional, and managerial changes             required to reduce impediments to the efficient performance             of the network. The focus of the final report is the             assessment of the 2030 traffic projections under low and             moderate and moderate and high economic growth scenarios             against the capacity of the network under the do-nothing             scenario and the full SEETO scenario and on the development             of the priority action plan. The report is organized as             follows: section one gives introduction .Section two             presents a brief assessment of the 2003 REBIS traffic             projections against reported counts. Section three presents             key non-physical impediments to transport and trade             facilitation, as well as the costs and benefits associated             with their alleviation. Section four presents the 2030             traffic projections for both the low and moderate and             moderate and high economic growth scenarios. Section five             presents the results of the capacity assessment of the             existing and planned networks to handle the projected             traffic. Section six presents the methodology used in the             preliminary economic efficiency analysis for assessing the             physical interventions and the results, while section seven             presents the priority action plan. Section eight provides             concluding comments.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Original document ==&lt;br /&gt;
&lt;br /&gt;
The different versions of the original document can be found in:&lt;br /&gt;
&lt;br /&gt;
* [http://hdl.handle.net/10986/28413 http://hdl.handle.net/10986/28413] under the license http://creativecommons.org/licenses/by/3.0/igo&lt;/div&gt;</summary>
		<author><name>Scipediacontent</name></author>	</entry>

	</feed>