Abstract

This project, which began in FY97, involves both the flow loop research on plugging and unplugging of waste transfer pipelines, and the large-scale industrial equipment test of plugging locating and unplugging technologies. In FY98, the related work was performed under the project [...]

Abstract

The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received [...]