Abstract

Preserving information integrity represent an urgent need for safety critical systems, where depending on incorrect or inconsistent information may leads to disasters. Typically, information integrity is a problem handled at technical level (e.g., checksumming). However, information [...]

Abstract

This paper presents a validated set of innovative maritime solutions analyzing, based on the extended"br" Failure Mode and Effects Analysis (FMEA) methodology, the main risks that could potentially hinder or delay"br" their implementation, thus providing a set of appropriate [...]

Abstract

The productivity and scalability of verifying pipelined circuits can be increased by exploiting the structural and behavioural characteristics that distinguish pipelines from other circuits. This paper presents a formal model of pipelines that augments a state machine with information [...]

Abstract

This paper presents a group maintenance scheduling case study for a water distribution network. This water pipeline network presents the challenge of maintaining aging pipelines with the associated increases in annual maintenance costs. The case study focuses on developing an effective [...]

Abstract

Pipelines present a unique challenge to monitoring because of the great geographical distances they cover, their burial depth, their age, and the need to keep the product flowing without much interruption. Most other engineering structures that require monitoring do not pose such [...]

Abstract

An Acceptance Test Report for the testing of Pumps, Leak Dectors, and Controls of an underground transfer line. Document type: Report

Abstract

The United States economy is heavily dependent upon a vast network of pipeline systems to transport and distribute the nation's energy resources. As this network of pipelines continues to age, monitoring and maintaining its structural integrity remains essential to the nation's energy [...]

Abstract

The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate [...]

Abstract

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline [...]