Abstract

This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the hydraulic analysis on the slurry line and the supernate line for W-320. This calculation will use the As-Built conditions [...]

Abstract

This report documents the results obtained during the performance of Preoperational Test POTP-007, from December 12, 1997 to March 27, 1998. The main objectives were to demonstrate the operation of the following Cross-Site Transfer System components: Booster pumps P-3125A and P-3125B [...]

Abstract

The purpose of this project is to investigate the technical and economic feasibility of using a new and advanced pneumatic capsule pipeline (PCP) system for transporting minerals and mine wastes. The new system is different from conventional PCPs in two main respects: (1) it uses [...]

Abstract

This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose [...]