Abstract

Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium [...]

Abstract

The objectives of this integrity test are to (1) inspect the interior of this pipeline by in-line camera survey and (2) if required, conduct a pressure test on a section of the pipeline. The U-1 and U-2 Cribs were constructed in 1951. From March 1952 to June 1967, the site received [...]