Abstract

The initial design criteria of the MSW to ethanol facility have been completed along with preliminary site identification and layouts for the processing facility. These items are the first step in evaluating the feasibility of this co-located facility. Pilot facility design and modification are underway for the production and dewatering of the lignin fuel. Major process equipment identification has been completed and several key unit operations will be accomplished on rental equipment. Equipment not available for rental or at TVA has been ordered and facility modification and shakedown will begin in October. The study of the interface and resulting impacts on the TVA Colbert facility are underway. The TVA Colbert fossil plant is fully capable of providing a reliable steam supply for the proposed Masada waste processing facility. The preferred supply location in the Colbert steam cycle has been identified as have possible steam pipeline routes to the Colbert boundary. Additional analysis is underway to fully predict the impact of the steam supply on Colbert plant performance and to select a final steam pipeline route.


Original document

The different versions of the original document can be found in:

https://www.osti.gov/servlets/purl/774488,
https://digital.library.unt.edu/ark:/67531/metadc717611,
https://digital.library.unt.edu/ark:/67531/metadc717611/m2/1/high_res_d/774488.pdf,
https://academic.microsoft.com/#/detail/103342583
Back to Top

Document information

Published on 01/01/2000

Volume 2000, 2000
DOI: 10.2172/774488
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?