Abstract

This document identifies the requirements and responsibilities for all parties to support waste transfer from the Plutonium Finishing Plant (PFP) facility to the Double-Shell Tank (DST) System of the River Protection Project (RPP). This Interface Control Document (ICD) will not attempt to control the physical portion of this interface because the physical equipment making up this interface, and any associated interface requirements, are already in place, operational and governed by existing operating specifications and other documentation. The PFP and DST Systems have a direct physical interface (the waste transfer pipeline) that travels between the 241-2 Building (TK-D5) and DST SY-102 via 244-TX double-contained receiver tank (DCRT). The purpose of the ICD process is to formalize working agreements between the RPP DST System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST System to support the Phase I Privatization effort.


Original document

The different versions of the original document can be found in:

https://digital.library.unt.edu/ark:/67531/metadc740301,
https://digital.library.unt.edu/ark:/67531/metadc740301/m2/1/high_res_d/798654.pdf,
http://www.osti.gov/servlets/purl/798654-hi6wvK/webviewable,
https://academic.microsoft.com/#/detail/2280185301
Back to Top

Document information

Published on 01/01/1999

Volume 1999, 1999
DOI: 10.2172/798654
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?